Construction of the pier with two berths. L = 120 m, a = 12 m |
One (1) mobile crane on wheels, a mobile lattice jib with a lifting capacity of 30 t to 12 m |
Construction of berth for passengers. L = 10 m |
One (1) self-propelled wheeled crane, jib 30 T capacity, mobile lattice jib with a lifting capacity of 30 t. |
Covered storage area for general cargo, S = 6.092 m2 |
One (1) Reach Staker |
Covered storage area for processing and storage for perishable goods, S = 600 m2 |
Two (2) pulling tractor for 30 T trailers (Tractor semi-trailer) |
Yard for container storage, S = 7.994 m2 |
Six (6) 4 T Elevators (forklifts) |
Construction of a water retaining structure upstream of dock |
Four (4) 30 T charging trolleys (Platform) |
Additional Facilities: Construction of buildings for administrative and service area |
Two (2) Container Chassis
One (1) boat for maintenance of river works |
Checkpoints facilities, truck scale, drinking water reservoir, water treatment tank, drinking water system and fire fighting network, sewage system and primary treatment plant for wastewater, lateral and crowning ditches, drainage channels, sub-drainage; electrical sockets in the refrigerated cargo container yards; power house to accommodate the electrical generating equipment. |
Other equipment necessary to handle cargo (equipment and tools for maintenance workshop, scale set foe crane, lifting equipment, among others.) |
|
 |